Oliver Vaughan Snell Bulleid (19 September 1882 - 25 April 1970) was a British railway and mechanical engineer best known as the Chief Mechanical Engineer (CME) of the Southern Railway between 1937 and the 1948 nationalisation, developing many well-known locomotives.
Contents |
He was born in Invercargill, New Zealand to William Bulleid and his wife Marian Pugh, both British immigrants. On the death of his father, Bulleid returned to Llanfyllin, Wales in 1889 with his mother, where the family home had been. In 1901, after a technical education at Accrington, at age 18 he joined the Great Northern Railway (GNR) at Doncaster as an apprentice under H. A. Ivatt, the CME.[1] After a four-year apprenticeship he became the assistant to the Locomotive Running Superintendent, and a year later the Doncaster Works manager. In 1908, he left to work in Paris with the French division of Westinghouse Electric Corporation as a Test Engineer, soon promoted to Assistant Works Manager and Chief Draughtsman. Later that year he married Marjorie Ivatt, Ivatt's youngest daughter.
A brief period working for the Board of Trade followed from 1910 arranging exhibitions in Brussels, Paris and Turin. During this time, he was able to travel widely in Europe, including a trip with Gresley, Stanier and Hawksworth to Belgium to see a metre-gauge bogie locomotive.[1] In December 1912, he rejoined the GNR as Personal Assistant to Nigel Gresley, the new CME. Gresley was only six years Bulleid's senior. World War I intervened; Bulleid joined the British Army and was assigned to the rail transport arm, rising to the rank of Major. After the war, Bulleid returned to the GNR as the Manager of the Wagon and Carriage Works.
The Grouping in 1923 of Britain's financially-troubled railways saw the GNR subsumed into the new London and North Eastern Railway (LNER), and Gresley was appointed the CME. He brought Bulleid back to Doncaster to be his assistant. During this period Gresley produced the majority of his famous locomotives and innovations, and Bulleid had a hand in many of them, including the P1 2-8-2 freight locomotive, the U1 2-8-0+0-8-2 Garratt freight locomotive, the P2 2-8-2 express locomotive and the A4 4-6-2 express locomotive.
In 1937, Bulleid accepted the post of CME of the Southern Railway (SR) at a salary of £3,000, after Richard Edward Lloyd Maunsell retired.[1] His first contribution to the Southern Railway was to oversee the construction of three 350 hp six-wheeled diesel-electric shunters ordered by Maunsell in 1936; three of these were built and proved effective, with a subsequent order being placed for eight more, though this was subsequently cancelled due to the onset of the Second World War.[2] Between 1949 and 1952, a further 26 of Bulleid's amended version of these locomotives were delivered and later became British Rail Class 12.
In 1938, Bulleid gained approval to build the Merchant Navy class of modern 4-6-2 "Pacifics", undoubtedly inspired by Gresley but also drawing on his experiences from across Europe and with all the most modern equipment; the design featured a partially welded boiler and firebox rather than traditional riveted designs, thermic syphons and a high-pressure boiler. It also included chain-driven valve gear immersed in an oil bath, a feature that was controversial and later caused problems if not maintained properly, which was difficult due to conditions after WW2.
Bulleid, like other engineers, had long felt that it was not ideal to have working parts exposed to the elements where they were subject to all the dirt thrown up from the track. He also thought that steam engines should get nearer to the internal combustion engine, which enclosed the working parts and used pump lubrication to keep it all running smoothly. Another advantage of enclosing the valve gear would be reduced day-to-day maintenance. Unfortunately there were design errors in the casing used for the oil bath, which led to leaks.
The first Merchant Navy locomotive, 21C1 Channel Packet, was built in 1941 and 29 followed, the last being 35030 Elder Dempster Lines. The West Country and Battle of Britain classes of slightly smaller light Pacifics followed in 1945. 110 were built, of which 21C101 Exeter was the first. His other major steam locomotive design, the Q1 "Austerity" 0-6-0 freight engine, appeared in 1942. All the steam locomotives designed by Bulleid for the SR had Bulleid-Firth-Brown wheels which gave even tyre support, but they did not eliminate the need for balance weights. The set up of the Bulleid valve gear enabled a locomotive to be built with no hammer blow. When the locomotives were rebuilt with Walschaerts valve gear, balance weights were installed in the wheels to reduce hammer blow.
Bulleid also played a major role in the electrification of the SR, including infrastructure, electric multiple units and electric locomotives. He designed the bodies for the two SR electric locomotives CC1 and CC2 in 1941 and 1945. A third example was built by British Railways in 1948 and numbered 20003. Towards the end of his tenure at SR he was responsible for the design and construction of Britain's only double-deck passenger trains, the two members of the 4DD class.
His final steam locomotive design for the SR was the unconventional Leader, appearing in 1949, after nationalisation. This had the boiler, coal and water supplies and everything else encased in a smooth double-ended body reminiscent of a diesel locomotive. The drive was through two six-wheel bogies, each with three cylinders. The axles on each bogie were connected by chains. The Leader was innovative, but unsuccessful, and after Bulleid had left British Railways the project was cancelled.
Bulleid worked briefly as CME of British Railways Southern Region. During this period his two prototype diesel electric locomotives appeared.
In February 1950, Bulleid was appointed CME of Córas Iompair Éireann (CIÉ), the nationalised transport authority of the Republic of Ireland, having been a consulting engineer to CIÉ since 1949. At CIÉ, he led the first major dieselisation programme, which involved the procurement of a fleet of diesel multiple units from AEC of Southall, 94 diesel locomotives (60 CIE 001 Class and 34 CIE 201 Class) from Metropolitan-Vickers and 12 Sulzer-engined diesel locomotives (CIE 101 Class) from the Birmingham Railway Carriage and Wagon Company. This began a transformation of railway traction in Ireland, although the diesel locomotives proved unreliable until most were re-engined.
Bulleid developed two prototype peat-burning locomotives for CIÉ, one a converted coal-fired traditional steam locomotive and the other, CC1, new and fully enclosed, along the lines of the Leader design. CIÉ did not adopt peat-fired traction for widespread use.
Bulleid retired from CIÉ in 1958, moving to Belstone in Devon, then Exmouth. He was awarded an honorary doctorate by the University of Bath in 1967. Shortly after he moved to Malta, where he died in 1970 aged 87.
Day-Lewis, Sean, Bulleid, Last Giant of Steam. George Allen & Unwin Ltd, London, 1964.
Business positions | ||
---|---|---|
Preceded by Richard Maunsell |
Chief Mechanical Engineer of the Southern Railway 1937–1947 |
Company nationalised |
Preceded by C.F. Tyndall |
Chief Mechanical Engineer of Córas Iompair Éireann 1950–1958 |
Succeeded by unknown |
Professional and academic associations | ||
Preceded by Andrew Robertson |
President of the Institution of Mechanical Engineers 1946 |
Succeeded by Dudley Gordon |